09/23/2026
A closer look at one of our biggest commercial installs to date for our friends at Padua Franciscan High School. 🏀
From the brand-new gymnasium to the hallways, locker rooms, ticket box, and everything in between, this project brought Padua’s brand to life throughout the entire facility.
We installed printed and cut graphics throughout the new gym, a massive wall mural spanning the length of the hallway leading into the gym, and detailed cut graphics throughout the facility—including halls, doors, locker rooms, and more.
We also installed frosted film on windows throughout the new facility, adding privacy while keeping the space consistent with the overall design.
Thanks to our friends at Padua for trusting us with such a huge project! 🐻🧡🖤