DizWiz Tech Solutions

DizWiz Tech Solutions Car Audio & Lighting Installations. Call or text with your vehicles year and model along with the type of work you’re looking for to get your free estimate.

Ask for Diz.

Nice rack! Last pic is what it was looking like before Wiz put his hands on it. Hard to tell there’s almost 40 cables so...
02/17/2023

Nice rack! Last pic is what it was looking like before Wiz put his hands on it. Hard to tell there’s almost 40 cables so far.

New pillar pods to house the 3” mid driver. PM for more info and to book your appointment
02/01/2023

New pillar pods to house the 3” mid driver. PM for more info and to book your appointment

Day one of  . 32ah LifePo4 battery bank, brand new JP23 amp to power that beautiful SQL Sub.
01/05/2023

Day one of . 32ah LifePo4 battery bank, brand new JP23 amp to power that beautiful SQL Sub.

Out with the old, in with the new. Custom soundbar for this jeep. Took the old subs out and hooked up a new pair with a ...
11/03/2022

Out with the old, in with the new. Custom soundbar for this jeep. Took the old subs out and hooked up a new pair with a new amp to give them juice! Hit your boy up for the clean work

Whole bumper had to come off to install these new headlights. Looking nice and clean. Another happy client
10/29/2022

Whole bumper had to come off to install these new headlights. Looking nice and clean. Another happy client

Work-in-progress. Full system on 2016 Civic. Fiberglass speaker pods and sail panel wrapped. 3-way active front stage in...
10/22/2022

Work-in-progress. Full system on 2016 Civic. Fiberglass speaker pods and sail panel wrapped. 3-way active front stage installed, still needs tuning. Amp rack still needs some color. A pillars, headliner, rear deck, custom sub box and trunk floor frame still need to be fabricated/completed.

Laying down some fiberglass to make the mold for the 3” midrange speakers.
10/10/2022

Laying down some fiberglass to make the mold for the 3” midrange speakers.

Masking off the dash. Going to be laying down some fiberglass to make these pods for the 3” on this active 3-way set-up.
10/07/2022

Masking off the dash. Going to be laying down some fiberglass to make these pods for the 3” on this active 3-way set-up.

These bad boys just came in. Time to do some fiberglass work to get those 3” midranges on the dash.
10/06/2022

These bad boys just came in. Time to do some fiberglass work to get those 3” midranges on the dash.

08/29/2022

Look at the lights on this sexy beast

Project Slingshot almost complete!
08/28/2022

Project Slingshot almost complete!

Address

1509 Congaree Street
Davenport, FL
33837

Alerts

Be the first to know and let us send you an email when DizWiz Tech Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share