22/10/2024
The construction of the Bangabandhu Sheikh Mujib Railway Bridge over the Jamuna River is 98% complete, with the remaining 2% expected to be finished soon. The authorities hope that the bridge will be open for traffic in December 2024. Once operational, the bridge is...