Programmed Timber

Call Directions Website Contact the business

Programmed Timber Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Programmed Timber, Wholesale & Supply Store, 44 Links Road, Saint Marys.

Programmed Timber is a Western Sydney timber processing, service & distribution company supplying bulk timber & components to Australian and export markets, from frame & truss fabricators to manufacturers, packaging & building material outlets.

𝗧𝗵𝗶𝘀 𝗽𝗿𝗼𝗱𝘂𝗰𝘁𝗶𝗼𝗻 𝗳𝗹𝗼𝗼𝗿 𝗲𝘅𝗶𝘀𝘁𝘀 𝘁𝗼 𝘁𝗮𝗸𝗲 𝘄𝗼𝗿𝗸 𝗼𝗳𝗳 𝘆𝗼𝘂𝗿𝘀.Every pack you see here represents work that would otherwise need to...
25/11/2026

𝗧𝗵𝗶𝘀 𝗽𝗿𝗼𝗱𝘂𝗰𝘁𝗶𝗼𝗻 𝗳𝗹𝗼𝗼𝗿 𝗲𝘅𝗶𝘀𝘁𝘀 𝘁𝗼 𝘁𝗮𝗸𝗲 𝘄𝗼𝗿𝗸 𝗼𝗳𝗳 𝘆𝗼𝘂𝗿𝘀.

Every pack you see here represents work that would otherwise need to be done on a fabricator's production floor.

Some of it is structural componentry that requires a verified grade, while some is traditionally recovered from offcuts. Because that recovered timber still gets used, its processing cost is often overlooked. Yet every piece still requires machine time, labour and handling, all of which come at a cost to the business.

We built this production line to undertake that work at an industrial scale, with the capacity to manufacture up to 200,000 components a day. Structural feedstock is scanned and graded before cutting, delivering accurate, grade-verified componentry ready for your production.

The capital investment has already been made, and that's where the real commercial value lies. Your saws, operators and production shifts can be directed towards manufacturing the components that are unique to each job, where your resources can deliver greater value.

That's what we mean when we say we understand the business of manufacturing with timber.

𝗧𝗵𝗲 𝘁𝗲𝗰𝗵𝗻𝗼𝗹𝗼𝗴𝘆 𝗶𝘀 𝗼𝘂𝗿𝘀, 𝗮𝗻𝗱 𝘁𝗵𝗲 𝗰𝗮𝗽𝗮𝗰𝗶𝘁𝘆 𝗶𝘁 𝗳𝗿𝗲𝗲𝘀 𝘂𝗽 𝗶𝘀 𝘆𝗼𝘂𝗿𝘀.

If you'd like to understand what that capacity could be worth to your business, using your own production figures, talk to us about our Truss Component Model.

𝗣𝗿𝗼𝗴𝗿𝗮𝗺𝗺𝗲𝗱 𝗧𝗶𝗺𝗯𝗲𝗿. 𝗕𝘂𝗶𝗹𝘁 𝗛𝗲𝗿𝗲. 𝗕𝘂𝗶𝗹𝘁 𝗳𝗼𝗿 𝗜𝗻𝗱𝘂𝘀𝘁𝗿𝘆.

ptimbers.com.au | 02 9623 7866

The most productive step in your plant might be the one you no longer need.Improving production efficiency isn't always ...
23/11/2026

The most productive step in your plant might be the one you no longer need.

Improving production efficiency isn't always about working faster. Sometimes, it's about removing unnecessary steps altogether.

That's the thinking behind The Programmed Timber Advantage.

👉 Swipe through to discover a better way to build.

Want to see what this could mean for your operation?

Book your personalised Truss Component Analysis. We'll use your plant's own operating figures to identify opportunities to improve efficiency, release capacity and strengthen your bottom line.

https://ptimbers.com.au/truss-component-analysis/

Behind every piece of timber we produce, there's a person whose knowledge, experience and attention to detail make all t...
18/11/2026

Behind every piece of timber we produce, there's a person whose knowledge, experience and attention to detail make all the difference.

It's the experience of someone who's spent years perfecting their craft. The trained eye that notices when something isn't quite right. The knowledge passed from one colleague to another, and the personal satisfaction of knowing a job has been done properly.

Walk through our factory and you'll see some impressive technology at work. But look a little closer, and you'll see the people who bring it all together.

People who understand their work, care about the outcome and take responsibility for getting it right.

Technology will continue to advance. Our capabilities will continue to grow. And as Programmed Timber moves into its next chapter, there's something worth remembering.

𝗢𝘂𝗿 𝗴𝗿𝗲𝗮𝘁𝗲𝘀𝘁 𝘀𝘁𝗿𝗲𝗻𝗴𝘁𝗵 𝗵𝗮𝘀 𝗻𝗲𝘃𝗲𝗿 𝗯𝗲𝗲𝗻 𝗺𝗲𝗮𝘀𝘂𝗿𝗲𝗱 𝗶𝗻 𝗺𝗮𝗰𝗵𝗶𝗻𝗲𝘀, 𝗺𝗲𝘁𝗿𝗲𝘀 𝗼𝗿 𝗽𝗿𝗼𝗱𝘂𝗰𝘁𝗶𝗼𝗻 𝘃𝗼𝗹𝘂𝗺𝗲𝘀.

𝗜𝘁'𝘀 𝗮𝗹𝘄𝗮𝘆𝘀 𝗯𝗲𝗲𝗻 𝗼𝘂𝗿 𝗽𝗲𝗼𝗽𝗹𝗲.

The people who turn up every day, share their knowledge, support their colleagues and take genuine pride in what they do.

To everyone behind Programmed Timber, thank you.

𝗬𝗼𝘂'𝗿𝗲 𝗻𝗼𝘁 𝗷𝘂𝘀𝘁 𝗽𝗮𝗿𝘁 𝗼𝗳 𝘄𝗵𝗮𝘁 𝗺𝗮𝗸𝗲𝘀 𝘁𝗵𝗶𝘀 𝗯𝘂𝘀𝗶𝗻𝗲𝘀𝘀 𝘄𝗼𝗿𝗸. 𝗬𝗼𝘂'𝗿𝗲 𝘁𝗵𝗲 𝗿𝗲𝗮𝘀𝗼𝗻 𝗶𝘁 𝘄𝗼𝗿𝗸𝘀 𝘀𝗼 𝘄𝗲𝗹𝗹.

A mill recently closed at Kyogle, but Australia's need for timber hasn't gone away.In 2025–26, the value of Australia's ...
16/11/2026

A mill recently closed at Kyogle, but Australia's need for timber hasn't gone away.

In 2025–26, the value of Australia's major wood product imports increased by 10.8% to $1.941 billion, despite relatively unremarkable demand.

It raises an important question for our industry. Are we making the best possible use of the timber we have?

Every cut, every material movement and every minute spent sorting and processing componentry carries a cost, even when the timber itself has already been paid for.

At Programmed Timber, we believe strengthening our domestic timber industry also means making better use of its resources.

By supplying precision-cut componentry, we help frame and truss manufacturers free up saw capacity, reduce unnecessary processing and keep their production focused on the work that delivers greater value.

We may not control global trade flows, but we can control how efficiently we use the resources available to us.

And increasingly, that is where the advantage lies.

ptimbers.com.au | 02 9623 7866

Celebrating Jimmy Chovnlamontry - 10 years at Programmed Timber.Today we recognise Jimmy Chovnlamontry, a Team Lead at P...
11/11/2026

Celebrating Jimmy Chovnlamontry - 10 years at Programmed Timber.

Today we recognise Jimmy Chovnlamontry, a Team Lead at Programmed Timber, and the experience he brings to his team.

A decade on the floor builds the kind of knowledge you cannot shortcut. Jimmy puts that to work every day, keeping production on track and the people around him supported.

Thank you, Jimmy, for your leadership and for the part you play in what we build.

Start January one step ahead.The first few weeks back after the Christmas shutdown can be challenging.Reduced staffing, ...
09/11/2026

Start January one step ahead.

The first few weeks back after the Christmas shutdown can be challenging.

Reduced staffing, full order books and production schedules that need to get moving quickly. We know how much pressure that can put on your team.

A little planning now can make a big difference.

By having your webs and creeper chords cut and ready before the Christmas break, you can free up valuable saw capacity and take some of the pressure off your team when production resumes.

At Programmed Timber, we're here to help you prepare for a smoother start to the new year.

Important dates:
📅 Tuesday 15 December: Final orders
🚚 Monday 21 December: Last delivery for 2026

Let's get your January componentry requirements sorted before the break.

📞 02 9623 7866
📧 [email protected]
🌐 www.ptimbers.com.au

Celebrating Drew Edge - 14 years at Programmed Timber.Today we're celebrating Drew Edge, part of our production team, an...
04/11/2026

Celebrating Drew Edge - 14 years at Programmed Timber.

Today we're celebrating Drew Edge, part of our production team, and recognising the experience and commitment he has brought to the business over the years.

Drew has been part of the day-to-day work that keeps production moving, building a depth of practical knowledge that only comes with time on the floor.

Thank you, Drew, for your long-standing contribution and for being part of the Programmed Timber team for so many years.

We have been through a few of these now.Work in this industry does not taper. It stops. A builder goes quiet and the ord...
02/11/2026

We have been through a few of these now.

Work in this industry does not taper. It stops. A builder goes quiet and the orders that were certain last month are not there this month.

What does not go quiet is the cost of cutting. The saw is still financed. The shift is still rostered. The operator is still on the floor. The cost holds while the revenue falls away.

That is the part almost nobody prices properly, and it is easy to see why. Cutting feels variable because it happens piece by piece. It behaves like a fixed cost the moment the work slows down.

We are not telling you to stop cutting. Keep your core production on the saw you have already paid for. The question is whether the smaller componentry needs to go through it too, because that is the part you can order to the work in front of you and carry nothing when the work is not there.

The plants that come through a quiet quarter in reasonable shape are usually the ones carrying less fixed cost in every truss.

If fixed cutting costs are squeezing your margin, talk to us about what supplementing could look like in your plant.

ptimbers.com.au | 02 9623 7866

Image credit: Melbourne Truss

Celebrating Timothy Watson - 10 years at Programmed Timber.Today we're celebrating Timothy Watson, one of our Line Leads...
28/10/2026

Celebrating Timothy Watson - 10 years at Programmed Timber.

Today we're celebrating Timothy Watson, one of our Line Leads, and recognising the contribution he has made to the business.

Over that time, Timothy has built a strong understanding of the operation and plays an important role in keeping his line running smoothly and supporting the people around him.

Thank you, Timothy, for your commitment, experience and contribution over the years.

We have watched a lot of Januarys from this side of the fence.You come back in the second week, half the crew is in, the...
26/10/2026

We have watched a lot of Januarys from this side of the fence.

You come back in the second week, half the crew is in, the order book is already behind, and the saw is expected to make up the difference. It happens every year and it is nobody’s fault. It is just what a shutdown does to a plant.

The only part of that restart that is already handled is the componentry you ordered before you locked the gate. Webs, creeper chords and blocks sitting there production ready, going straight into the press. Not a cut on your floor.

Everything else waits for you, and it waits for fewer people with less time.

We will be back before most of you are, and that helps with a lot of things. It does not help with creeper chords cut to your spec. Those need lead time either way, and the time to work that out is while you can still think straight about it, not in the second week of January when you are already behind.

Talk to us about your restart volumes.

ptimbers.com.au | 02 9623 7866

Image credit: Melbourne Truss

Address

44 Links Road
Saint Marys, NSW
2760

Alerts

Be the first to know and let us send you an email when Programmed Timber posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Programmed Timber:

Shortcuts

Share

Nearby shops